Top 10 Longest Train Routes In India

Top 10 Longest Train Routes In India

Here is the list of Top 10 Longest Train Routes In India, We’ll discuss India’s longest train. The longest train does not necessarily equal the one that goes the greatest distance. or go a great distance because everyone knows that the Vivek Express, which runs from Dibrugarh to Kanyakumari, is India’s longest train. In this section, we will discuss India’s physically biggest train. That is the one with the longest length. Sheshnag is the name of the train, which began operations on July 2, 2020, and is India’s largest-ever cargo train.

The appeal of rail travel resides in the leisurely routes and enough space within the carriage. However, transferring trains might be inconvenient. India boasts one of the world’s largest railway networks, with 115,000 km of train track across a length of 65,000 km and 7,500 stations. On a daily basis, these Indian train lines and stations service 12,617 passenger trains and 7421 freight trains. It comprises several extremely extensive roads that span India’s length and breadth. Here is a list of the ten longest railway rides in India that may be completed in a single train.

List of Top 10 Longest Train Routes In India

10. YESVANTPUR – KAMAKHYA ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

The ACSF express serves the vanpool connection between YESVANTPUR and KAMAKHYA. The northeast border railway zone operates this extremely fast train, which runs through Karnataka. In India, Tamil Nadu, Andhra Pradesh, Bihar, West Bengal, and Assam are the origin states. The entire distance covered is 325 kilometers in the allocated period of 52.5 hours.

9. KOCHUVELI – DEHRADUN ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

The Southern Railway Zone manages the Super Fast Express, which links Koji Valley to Trivanantanpuram and Dehradun in the Garhwal area. The train travels through nine Indian states, including Uttarakhand. State of Uttar Pradesh Maharashtra Delhi Rajasthan Goa, Kerala Gujarat, and Karnataka Kojo Dehradun superfast cover a total distance of 3459 kilometers at a speed of 60 kilometers per hour on average.

8. TINSUKIA – BENGALURU ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

As the name implies, the new Tinsukia Bengaluru weekly express is a weekly train that links Tinsukia in Assam with Bengaluru in Karnataka. This train commenced operations in 2010 and is still in use today; it travels 3590 kilometers in 65 hours on average, stopping at 36 significant railway stations along the route, many of which are in well-known locales.

7. KOCHUVELI – AMRITSAR ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

The KOCHUVELI ambulator weekly express runs weekly between Kochi valley in the south and Amritsar junction in the north. It is a super fast train that runs on a weekly basis. The Kochi valley a military super express covers a total distance of 3,597 kilometers and 58 hours. It stops at 25 important stations along the way.

6. HUMSAFAR EXPRESS ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

HUMSAFAR express, which began operation in December 2018, is one of the Indian railroads’ newest acquisitions. One of our country’s longest roadways links Agartala with Bangalore cantonment. The ham Safar express covers 65.5 kilometers in 65.5 hours, stopping at 28 main stations.

5. NAVYUG EXPRESS ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

NAVYUG EXPRESS is ranked fifth. The navy express is another weekly train that operates between Mangalore Central and Katra. This train is widely renowned for traveling the country’s fifth to the longest route. The navy express traverses 3685 kilometers and takes roughly 68 hours to complete the voyage.

  • Karnataka
  • Pondicherry
  • Andhra Pradesh
  • Telangana
  • Madhya Pradesh
  • Maharashtra
  • Haryana
  • Punjab
  • and Jammu Kashmir

4 . HIMSAGAR EXPRESS ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

the fourth EXPRESS HIMSAGAR HIMSAGARHIMSAGARHIMSAGARHIMSAGARH One of the most well-known trains operates between KANYAKUMARI and Sri Mata Vaishno Devi Katra, according to Sagar. It is one of our country’s longest rounds, with an estimated distance of 3789 kilometers. HIMSAGAR EXPRESS operates on a weekly basis and stops at 73 destinations in 12 states. There are 19 coaches in all, separated into second, third, and unreserved classes.

3. ARONAI SUPERFAST ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

The authorized superfast express is one of the most popular trains that run between Thiruvananthapuram central and SILCHAR. This train is usually on time and travels 3931 kilometers in 74 hours. The auto night express runs every Tuesday and makes 57 stops along the way. There are 23 coaches on the train, including the ac2 tier ac3 tier sleeper class and second seating coaches.

2. THIRUVANANTHAPURAM – SILCHAR ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

The Thiruvananthapuram central SILCHAR express train is commonly considered one of the longest-running superfast trains in the Indian subcontinent. It used to travel between the Thiruvananthapuram central and Guajatu areas, but in 2017 the route was extended to SILCHAR.

1. VIVEK EXPRESS ( Longest Train Route in India MAP )

Top-10-Longest-Train-Routes-In-India
Top-10-Longest-Train-Routes-In-India

At number one is Vivek express, VIVEK EXPRESS is a weekly train operated and managed by the Indian railways that connect major cities across the country the train journey between Kanyakumari and Dibrugarh is said to be the longest in India the total distance traveled is 4234 kilometers and it takes approximately 74 hours to complete this express train travels through 8 Indian states and makes 57 stops before arriving at its final destination.

Thoughts:

On June 30, 2020, railroads conducted a train called Super Anaconda, which consisted of 177 wagons. This train was loaded, and 15,000 tonnes of cargo were removed from it in a single journey. Sheshnag has the record for the largest train in India. Because 2.8 kilometers is a really long distance.

FAQ:

Q: What is the length of India’s longest train Sheshnag?

A:  2.8 km is the length of India’s longest train Sheshnag.

Q: Now a question arises what was difficult in it? Why can’t we increase all trains length? OR Now the issue is, what was difficult about it? Why can’t we make all trains longer?

A: The most difficult aspect of running lengthy trains is stopping them. According to the trains, all stabling lines, loop lines, and platform lengths in India are roughly 700 meters. Maximum trains can be halted in these loop routes at 700 meters. If a train is larger than this, it will exit the station’s loop lines. Trains cannot be halted at any point along the track.

If this 2.8 km long train comes to a halt somewhere, the entire path would be closed. As a result, it must be moving for containers and cannot be stopped. And no trains can cross or travel through it. As a result, during the lockdown, this trial was effortlessly successful. Because the roads were clear and no trains had to be diverted.

Tractive attempts that are pulling force are another technological challenge in running lengthy trains. The coupler connects all of the carriages on the train. The coupler, which couples and links one coach to another, differs across coaches and wagons. This coupler transfers the locomotive’s hauling force from one carriage to the next. However, this coupler has a bearing limit and a capacity. They can’t withstand pulling power after a certain point. As a result, we cannot have a train’s length after a limit.

To address this, distributive locomotives were put on trains such as Sheshnag and others. Instead of placing all of the locomotives in front, they are placed in the middle. As a result, all of the force is spread evenly over the whole train rather than just the early beginning coaches.

However, we do not have enough super technology to control all of the locomotives without wire connections. They once ran on estimation by having loco pilots in all locos, but this technique is neither safe nor possible on a regular basis. As a result, until good technology arrives to operate locos remotely in railway’s electrical locomotive, Long trains would not be completely operational until that time.

Q: The Longest Train in the World?

A: Now if we talk about the world, then 2.8 km is nothing In Australia, a goods train of 7.8 km was run that too loaded with 82,000 tonnes of iron was transported with a single train.

NEXT

 BBC 

Top 10 Indian Army Uniform

List of Indian Army Tanks ( Name List )

Top 10 Future Weapons of India

Leave a Comment

Share via
Copy link
Powered by Social Snap